Investment Guide
Investment GuideInvestor's guide › Cost of Electricity
Cost of Electricity
Print E-mail
Subscriptions to service provider (Electricity of D JIBOUTI) can also be made directly at the National Investment Promotion Agency office.

1. How to get a connection?

New Connection, documents to provide:
  • Certificate of conformity affixed 2 visa department of housing and management of civil protection.
  • Proof of identity (national identity card, passport, driving license, or the legal status of the company).
  • Request lettre for Connection.


New subscription to an existing connection:
  • Reference (No meter or old bill's predecessor)
  • Proof of identity (national identity card, passport, driving license, or legal status of the company and registration number in the register of commerce).
  • Lease for the tenant.
  • Request letter.

2. How to cancel?

  • Requesting termination of the customer.
  • Presentation of identification.

Source : Rates effective from 1 May 2009
BASE VOLTAGE
CODE PRICE PER UNIT Thickness of water per month FIXED PREMIUM ADVANCE Maintenance
1 2 1 2 By month Consumption
FD FD KWh KWh FD FD FD
HOME PS=1 KVA 1 34 70 200 surplus 490 3668
HOME PS = 3 KVA 2 52 49 105 surplus 857 18574
= 6 KVA 52 49 120 surplus 963 37148
= 6 KVA 52 49 135 surplus 1178 55721
>= 9 KVA 52 90+ (5 x PS) surplus 1346 18574 parTr. de 3 KVA
GENERAL NON DOMESTIC PS < or = 36 KVA 3 67 - PS < or = 36 KVA - 545 3668 for 1 kVA 18574 throughTr. de 3 kVA
PS > 36 KVA 67 - Conso.Totale - 59 x PS 7715/kVA
avec ind P max 67 - Conso.Totale - 72 x PS 7715/kVA
BACKERS 4 54 - Conso.Totale - 1369 18574 by Tr. de 3 kVA
DEGRESSIF (Front/ind/max.) PS < 08 KVA 5 66 57 180 x PS surplus 467 7715/kVA
PS > 08 KVA 66 57 180 x PS surplus 1712 x (PS-8) 7715/kVA
DISTRICTS PS < ou = 36 KVA 7 54 - Conso.Totale - 486 Same Djibouti
PS > 36 KVA 54 - Conso.Totale - 52x PS Same Djibouti
PUBLIC LIGHTING 8 53 - Conso.Totale - - -
PRICE STARTS 9 67 - Conso.Totale - 6987/18 kVA 165600/18 kVA
MEDIUM VOLTAGE
INDUSTRIAL
PS > ou = 250 KVA
11 47 38 0 to 200 KVA: 250 x PS surplus 1740 x PS 0 to 36 KVA :
15 950 FD per tranche de 3 KVA.
The rest : 6625 FD par KVA.
19214 up 40 kVA
else
4425 per 20 kVA
201 to 500 KVA: 200 x PS surplus 1740 x PS
501 to 900 KVA: 175 x PS surplus 1652 x PS
901 to 1300 KVA: 175 x PS surplus 1566 x PS
More than 1300 KVA: 175 x PS

surplus

1479 x PS
CIRCLES 12 60 51 0 to 200 KVA: 250 x PS surplus 1740 x PS
201 to 500 KVA: 200 x PS surplus 1740 x PS
501 to 900 KVA: 175 x PS surplus 1652 x PS
901 to 1300 KVA: 175 x PS surplus 1566 x PS
More than 1300 KVA: 175 x PS surplus 1479x PS

INDUSTRIAL

PS > ou = 250 KVA
13 33 37 0 to 200 KVA: 250 x PS surplus 1740 x PS
201 to 500 KVA: 200 x PS surplus 1740 x PS
501 to 900 KVA: 175 x PS surplus 1652 x PS
901 to 1300 KVA: 175 x PS

surplus

1566 x PS
More than 1300 KVA: 175 x PS surplus 1479x PS
Source : Rates effective from 1 May 2009